DF-GEN-01-TP-02 / DRAFT-1 / DF-GEN-01 / DEMO-01
Inert model/approved training fixture only. Not an OEM operating SOP, service release or competence certificate.
Complete the configuration/component exercise and state the inert-model boundary.
HOUSING · Expected: Correct fixture and source revision are identified.Open the model access-door view. Check the door/fixture relationship visually.
DOOR · Expected: Door clears the represented support path.Select the upper retaining assembly and observe that its pivot stays on the fixed structure.
CLIP_UPPER · Expected: The upper assembly is conserved.Select the separate lower assembly; the cover remains seated until both represented states have been reviewed.
CLIP_LOWER · Expected: Two assemblies remain; housing is fixed.Move to the axial cover-inspection pose. The support carriage follows the cover.
COVER · Expected: Cover motion is axial and continuously supported.View the cover’s supported rightward inspection position.
COVER_SUPPORT · Expected: The cartridge axis is clear before A moves.Observe the lowered extension and subsequent raised support pose.
CRADLE · Expected: Support is in place before A is shown withdrawn.Move toward full inspection spread and follow A along the same axis.
ELEMENT_A · Expected: The original A stays rigid; B does not move into the housing.Return the inspection slider toward assembly: A returns before supports retract and the door closes.
ELEMENT_A · Expected: The inverse order is visible; no new cartridge appears.Record unclear geometry or evidence for a qualified reviewer. Physical fit and release need their own approved source.
HOUSING · Expected: Model inspection is not recorded as real equipment readiness.